PROJECT DESCRIPTION:
This phase of the Cerrillos Road project is approximately 1/2 mile long and begins near Cielo Court and ends at Camino Carlos Rey. Improvements will continue those made from Airport Road to Cielo Court which include:
- Storm drain
- New roadway pavement
- Sidewalks
- Bike lanes
- Bus land / right-turn auxiliary lanes
- Median modifications
- Landscaping
- Bus stops
Storm Drain:
- 66” Storm drain will be placed near the center of Cerrillos Road at an approximate depth of 14’.
Curb drop inlet to be constructed in the outside curb line.
Roadway work:
- Curb and gutter
- Sidewalk
- Three driving lanes in each direction
- Left turn lanes at intersections
- Bike lane
- Auxiliary right turn lanes
- Traffic signals
- Street lighting
- Permanent signing and striping
Landscaping of medians and parkways:
- New landscaping in the median and parkways with irrigation
Traffic Controls:
- Minimum of two lanes open in each direction
- Please respect flag personnel and be alert for workers and heavy equipment near traffic lanes.
- Left turns open through median construction marked by orange barrels.
Business and Residential Access in Work Zone:
- Business driveways and side streets open and accessible northbound and southbound
Proposed Design
Plans for Phase IIB have not yet been finalized.
The graphic below illustrates the proposed design for the project.

|
|
|